欢迎光临 [ 新利体育平台比分 / 新利体育网址 ] 官方网站!

网站首页
营销电话:0510-88787772
Application area Engineering generalcontractor Boiler modification Equipment installation

Glass industry





Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 13646 次

相关文档

Copy right © 2018 新利体育平台比分 / 新利体育网址 版权所有

备案号:苏ICP备18052993号-1

Baidu
map